Wilmar Bioethanol Plant: Stormwater Sump Project

ARP Engineering was engaged to provide engineering and drafting services for the construction of a stormwater sump at the Wilmar Bioethanol Plant in Yarraville, Victoria. This project involved the development of detailed construction drawings to facilitate the upgrade of the existing bioethanol storage facility’s stormwater management infrastructure.
Project Overview+

ARP Engineering provided engineering and drafting services for the installation of a stormwater system and lining system at the Wilmar Bioethanol Plant in Yarraville, Victoria. This project involved developing detailed construction drawings to upgrade the plant’s existing stormwater management infrastructure.

Site Preparation and Paving+

ARP’s engineering and drafting team created detailed plans for the preparation and paving of the stormwater sump. This included selecting appropriate paving materials, drainage gradients, and jointing details to ensure effective stormwater flow and prevent water accumulation within the bunded area. The site preparation also involved excavation, earthworks, and installation of sub-base materials to establish a solid foundation for the stormwater infrastructure.

Stormwater System Design+

The stormwater sumps were designed with careful consideration of their size, location, and connections to the drainage system. Detailed drawings were provided to ensure their efficient integration into the overall stormwater system for optimal water collection. Additionally, ARP developed construction drawings for the installation of steel structures, such as sump support frames and grating covers, to enhance the durability and stability of the system.

Coordination and Final Integration+

An essential aspect of the project involved the coordination of sump locations in relation to the existing piping lines within the facility. ARP worked closely with the project manager to ensure the placement of the sumps, ensuring they were well-integrated into the facility’s existing infrastructure. This planning ensures that the stormwater system will operate effectively.

ARP’s engineering and drafting services were integral to the design process and enabled the successful installation of the stormwater sump at the Wilmar Bioethanol Plant. The detailed plans and designs ensured all elements were successfully implemented, facilitating smooth construction and greatly improving the effective management of stormwater at the facility.