On a very short time scale ARP delivered IFC drawings for the remediation of a deteriorated drain located in a workshop carpark. The drain was exposed as defective during an exploratory survey. The defective drain was compromising the local ground stability so action was taken to remove the old components of the drain and replace … Continue reading HV Workshop Storm Drain
Copy and paste this URL into your WordPress site to embed
Copy and paste this code into your site to embed