On a very short time scale ARP delivered IFC drawings for the remediation of a deteriorated drain located in a workshop carpark. The drain was exposed as defective during an exploratory survey. The defective drain was compromising the local ground stability so action was taken to remove the old components of the drain and replace them with new. ARP were commissioned to review the possible options for replacement that took into account cost, practicality and timescale to complete. A concrete piping option with ground remediation was decided on which was designed to IFC status for the client to proceed to construction.
Key Design Outcomes
- Improvement in Environment control (water flow and discharge)
- Improved storm Water management
- Improved pavement design capacity to resist loads from heavy vehicles travelling over the culvert