Pipe Spool Change-out Equipment

  • admin
  • April 17, 2013

ARP were engaged to take the client’s concept design through to Issue for Fabrication stage. The design requirements were for a trestle and trolley arrangement to change-out large diameter pipes within a decline tunnel. Trestle components were required to be hand-carried. The resulting design and procedure met the client’s expectations of functionality and exceeded their expectations of design documentation quality.

Key Design Improvements
  • Safer Pipe Removal
  • Shutdown Simplification