Pipe Spool Change-out Equipment
ARP were engaged to take the client’s concept design through to Issue for Fabrication stage. The design requirements were for a trestle and trolley arrangement to change-out large diameter pipes within a decline tunnel. Trestle components were required to be hand-carried. The resulting design and procedure met the client’s expectations of functionality and exceeded their expectations of design documentation quality.
Key Design Improvements
- Safer Pipe Removal
- Shutdown Simplification